Griffins Head Hotel

Griffins Head Hotel

Project Value:       $2.1M

Completion Date: 2009

Key Personnel:    Studio Nine Architects

                                   Secon Pty Ltd

HT Constructions

Project Overview:
Upgrade and extension of existing building.

Secon’s Role:
Secon provided Mechanical, Electrical, Hydraulic, Fire and ESD services.

The existing air conditioning systems were replaced with a several split ducted units to suit the new internal layouts. An energy efficient initiative was incorporated to shut down the air conditioning systems when the windows were opened thereby giving the occupants the choice to let certain areas be conditioned by outside ambient conditions with a resultant reduction in running cost of the mechanical systems.